1. General introduction
The prior joint inspection is an essential step in the preparation of work carried out by an external company on an industrial site. It should never be considered as an additional administrative formality. It is, on the contrary, a key moment in prevention, because it allows all the stakeholders concerned to share a common vision of the site, its risks, its constraints and the prevention measures to be put in place.
When an external company intervenes on an industrial site, it does not operate in a neutral environment. It enters a system already in operation, with its installations, its utilities, its rules, its traffic flows, its specific dangers, its operating constraints and, often, other companies present at the same time. The risk therefore does not come only from the activity that the external company will carry out. It also comes from the environment in which it operates, the coactivity with other actors, the state of the installations and the way in which the work will be coordinated.
The prior joint inspection exists to meet this need. It makes it possible to carry out an inventory before work, to identify the risks of interference, to check that the documents are consistent, to organize the provision of facilities and to ensure that everyone knows their responsibilities.
In SOOKSOOK logic, this step has an even greater value. It is not only used to create a file. It makes it possible to structure the operation, to make responsibilities visible, to link risks to areas, companies, documents and decided measures, and therefore to transform a complex set of information into coordinated and traceable action.
Détails
- 1 Section
- 24 Lessons
- Durée de vie
- INSPECTION COMMUNE PRÉALABLE & PLAN DE PRÉVENTION24 Items
- 1.1ICP & PDP – 2. À quoi sert réellement l’inspection commune préalable
- 1.2ICP & PDP -3. Différence entre inspection commune préalable, PPS et plan de prévention
- 1.3ICP & PDP -4. Les acteurs concernés
- 1.4ICP & PDP -5. Les informations générales du chantier
- 1.5ICP & PDP -6. La préparation en amont : pré-analyse de risques et visites techniques d’installation
- 1.6ICP & PDP -7. La structure du plan de prévention
- 1.7ICP & PDP -8. Les engagements des entreprises extérieures
- 1.8ICP & PDP -9. Le rôle des C2SCT et des représentants
- 1.9ICP & PDP -10. Identification détaillée des entreprises et des représentants
- 1.10ICP & PDP -11. Les conditions de vie et de circulation autour du chantier
- 1.11ICP & PDP -12. Inventaire des dangers présents lors de l’inspection commune préalable
- 1.12ICP & PDP -13. État requis avant intervention et opérations de mise à disposition
- 1.13ICP & PDP -14. Mesures collectives de prévention
- 1.14ICP & PDP -15. Mesures individuelles de prévention
- 1.15ICP & PDP -16. Santé, surveillance médicale renforcée et travaux dangereux
- 1.16ICP & PDP -17. L’analyse détaillée des familles de risques
- 1.17ICP & PDP -18. Annexes et documents associés
- 1.18ICP & PDP -19. Coordination générale et analyse des coactivités
- 1.19ICP & PDP -20. Mise à disposition de produits, fluides, matériels et locaux
- 1.20ICP & PDP -21. Consignes particulières et numéros utiles
- 1.21ICP & PDP -22. Comment se déroule concrètement une inspection commune préalable
- 1.22ICP & PDP -23. Les erreurs fréquentes à éviter
- 1.23ICP & PDP -24. Ce qu’il faut retenir
- 1.24ICP & PDP -Quiz — Inspection Commune Préalable & Plan de Prévention