Course objective
This SOOKSOOK course accompanies the user in the technical familyLoad handlingfor the jobLevageur. This is not a simple theoretical reminder: the goal is to learn how to produce a clear, usable field report linked to the right equipment, the right area or the right installation.
The course explains how to choose the right form, how to fill in the important fields and how to transform an intervention into useful data for maintenance, operation, security and traceability.
Business context covered
- Equipment and supports concerned:traveling cranes, cranes, hoists, winches, hooks, slings, chains, shackles, spreader bars, long or bulky loads.
- Common situations:positioning, accessory control, slinging, lifting of load, movement of suspended load, test after troubleshooting or lifting incident.
- Risks to consider:falling load, crushing, swinging, overloading, accessory breakage, person under load, collision, wind and poor communication.
- Expected checks:CMU, hook condition, cable, latch, sling, sling angle, lifting area, communication, take-off test and stable removal.
- Useful measures:load weight, CMU, lifting height, travel distance, number of attachment points, maneuvering time.
Expected result
At the end of the course, the user should be able to complete a report that explains what was found, what was monitored, what was measured, what was done, what remains to be monitored and whether the equipment can be returned to service.
This course contains15lessons: detailed business method lessons, then lessons dedicated to the forms available in this family.
Détails
- 1 Section
- 15 Lessons
- 10 Weeks
- Formation — Manutention charge15 Items
- 1.101 — Comprendre la famille technique — Manutention charge15 Minutes
- 1.202 — Identifier les équipements, zones et situations couvertes — Manutention charge15 Minutes
- 1.303 — Risques, dangers, EPI et conditions préalables — Manutention charge15 Minutes
- 1.404 — Méthode de rédaction du rapport métier — Manutention charge15 Minutes
- 1.505 — Exploiter les contrôles, mesures, anomalies et réserves — Manutention charge15 Minutes
- 1.606 — Formulaire — Rapport levage charge simple10 Minutes
- 1.707 — Formulaire — Rapport levage charge longue10 Minutes
- 1.808 — Formulaire — Rapport levage charge asymétrique10 Minutes
- 1.909 — Formulaire — Rapport retournement charge10 Minutes
- 1.1010 — Formulaire — Rapport déplacement charge suspendue10 Minutes
- 1.1111 — Formulaire — Rapport pose charge sur support10 Minutes
- 1.1212 — Formulaire — Rapport levage en coactivité10 Minutes
- 1.1313 — Formulaire — Rapport levage à proximité installation10 Minutes
- 1.1414 — Formulaire — Rapport arrêt levage pour situation dangereuse10 Minutes
- 1.1515 — Formulaire — Rapport fin opération levage10 Minutes